Sunday, September 30, 2012

Home Sweet Home...Week five


Kitchen



Entry

Master bedroom

Living room

Kid's playroom/formal dining

craft room furniture options, yes the cardboard is cut to scale for the furniture


The boys

Sunday, September 23, 2012

Home Sweet Home...Week 4

no shingles

pretty arch into the craft room

pretty ceiling arch in the entrance and the dining room on the left
nitch where the cooler is and entryway 

outside fireplace


arch into the back hallway from the kitchen



Arch into the kitchen from the dinning

arch walkway into the shower and one for a window

outside fireplace and siding on the walls

more patio and siding

Shingles!


bathtub and linen closet


Front porch roof

Dry wall has been delivered!


back shingles on the roof and siding on the master bath bump out and chimneys

Sunday, September 16, 2012

Home Sweet Home...Week 3

There were some big changes this week.  The framing of the roof was finished, including the radiant barrier, and black paper. The Hvac people installed the duct work, and the electrical boxes were nailed in the studs. Also, not shown in the pictures, but the windows are also installed and the framers added the inside archways.  Dad and I ran speaker wire for a future surround sound and a little bit of Ethernet cable. 



Looking through the eat in kitchen to the living room and into Wesley's room

Kitchen, pantry, and formal dining (kids play area)


Looking into the kitchen

Duct puzzle

Kid's bath

Wood burning stove place and looking into the craft room

Craft room and back of stoveplace

Sunday, September 9, 2012

Home Sweet Home...Week 2

This week we could really see the rooms and start to plan a little bit for who is going to get which room. We also found out the forms guy added an extra three feet but the mistake was not caught until after the concrete was poured, so, the house is a little bit bigger than intended. Oh well, I'm sure we can figure out what to do with the extra space.
Back of the house, craft room

Garage

From master bedroom through the wall into the eat in kitchen

Back of the house, craft room, bedrooms to the left and back patio to the right

Front of the house bedrooms on the right


Looking out the playroom window (formal dinning)
Front Porch



Wednesday, September 5, 2012

Wesley's First Day of Preschool: Rainbow Fish

Wesley has moved up to the last year of preschool, the Rainbow Fish!  What a difference two years makes.  We could hear the screaming and crying coming from the two year old class, but there were no tears for the fours, just smiling faces all around.  Next year we won't be so lucky as Cassie will start preschool and there will be lots of crying.







Hanging out on Labor day: